Project Description
Project Brief
For this project, our company was responsible for purchase engineering services, procurement, Technical Inspection and good transportation of mechanical, electrical, control, and instrument equipment of municipal wastewater treatment plant. Average flowrate 600000 m3/d.
Type of agreement for this project is EP.
Made by
Other project images
Skills Needed
- Environmental engineering,
- Chemical engineering,
- Mechanical engineering,
- Civil engineering,
- Instrumentation and Control engineering.
Initial Concept Planning
For this project, our company was responsible for purchase engineering services, procurement, Technical Inspection and good transportation of mechanical, electrical, control, and instrument equipment of municipal wastewater treatment plant. Average flowrate 600000 m3/d. Type of agreement for this project is EP.
Drafts & Revisions
The screened wastewater is entered to grit and grease chamber. In aerated grit chamber air is introduced along one side of a rectangular tank. The separation of grit from wastewater is usually accomplished in separate grit chamber designed to physically separate heavy grit particles from lighter organic solids. The grit accumulated on tank bottom is pumped to grit collecting tank.
Other information
Advanced treatment plant is constructed for reusing of treated wastewater. There is a complete process arrangement for treating in order to meet requirement for reuse. Wastewater treatment plant effluent is stored in a storage tank. Disinfection is done by injection of calcium hypochlorite 10% to storage tank.
Full technical specifications
Click here to download the PDF file.
Excellent Results
This project fully met our customer’s expectations.