VAT NUMBER:
IT07837010961
Operative office:
(+39) 02.09966414
Head office:
(+39) 02.67076749
info@eetwater.it

Equipment supply

Cogenerator spare part supply

2025-11-18T09:53:35+00:00

Project Brief

For this project, our company was responsible for purchase engineering services, procurement, Technical Inspection and good transportation of Cogenerators spare parts.
Type of agreement for this project is EP.

Product: Main Bearing MWM 12452207

Engine Type: MWM TCG 2020

Origin: Austria

Quantity: 56

Unit Price: 138 €

Product: Sealing Gland MWM 12307718

Engine Type: MWM TCG 2020

Origin: Austria

Quantity: 22

Unit Price: 84 €

Product: Compensator MWM 12300185

Engine Type: MWM TCG 2020

Origin: Austria

Quantity: 3

Unit Price: 325 €

Product: Big end bearing MWM 12420916

Engine Type: MWM TCG 2020

Origin: Austria

Quantity: 45

Unit Price: 210 €

Product: Oil filter turbo charger MWM 12272453

Engine Type: MWM TCG 2020

Origin: Austria

Quantity: 150

Unit Price: 6.5 €

Product: O-seal  MWM 01163400

Engine Type: Charge air cooler, for MWM TBG 620

Origin: Austria

Quantity: 200

Unit Price: 6 €

Made by

Other project images

Skills Needed

  • Mechanical engineering,
  • Instrumentation and Control engineering.
Water savings 97%
Energy savings 71%
Environment impact 32%
Customer satisfaction 100%

Full technical specifications

Click here to download the PDF file.

Excellent Results

This project fully met our customer’s expectations.

Mechanical, Electrical, Control, and Instrument spare part supply -2

2025-11-18T09:53:58+00:00

Project Brief

For this project, our company was responsible for purchase engineering services, procurement, Technical Inspection and good transportation of mechanical, electrical, control, and instrument equipment of municipal wastewater treatment plant.
Type of agreement for this project is EP.

Made by

Other project images

Skills Needed

  • Mechanical engineering,
  • Instrumentation and Control engineering.
Water savings 97%
Energy savings 71%
Environment impact 32%
Customer satisfaction 100%

Full technical specifications

Click here to download the PDF file.

Excellent Results

This project fully met our customer’s expectations.

Aeration System Supply

2025-04-24T11:06:56+00:00

Project Brief

For this project, our company was responsible for purchase engineering services, procurement, Technical Inspection and good transportation of Turbo Blowers with average flowrate 4600 m3/hr
Type of agreement for this project is EP.

Made by

Other project images

Skills Needed

  • Environmental engineering,
  • Mechanical engineering
  • Instrumentation and Control engineering.
Water savings 97%
Energy savings 71%
Environment impact 32%
Customer satisfaction 100%

Full technical specifications

Click here to download the PDF file.

Excellent Results

This project fully met our customer’s expectations.

Mechanical, Electrical, Control, and Instrument spare part supply

2025-11-18T09:54:08+00:00

Project Brief

For this project, our company was responsible for purchase engineering services, procurement, Technical Inspection and good transportation of mechanical, electrical, control, and instrument equipment of municipal wastewater treatment plant. Average flowrate 600000 m3/d.
Type of agreement for this project is EP.

Made by

Other project images

Skills Needed

  • Environmental engineering,
  • Chemical engineering,
  • Mechanical engineering,
  • Civil engineering,
  • Instrumentation and Control engineering.
Water savings 97%
Energy savings 71%
Environment impact 32%
Customer satisfaction 100%

Initial Concept Planning

For this project, our company was responsible for purchase engineering services, procurement, Technical Inspection and good transportation of mechanical, electrical, control, and instrument equipment of municipal wastewater treatment plant. Average flowrate 600000 m3/d. Type of agreement for this project is EP.

Drafts & Revisions

The screened wastewater is entered to grit and grease chamber. In aerated grit chamber air is introduced along one side of a rectangular tank. The separation of grit from wastewater is usually accomplished in separate grit chamber designed to physically separate heavy grit particles from lighter organic solids. The grit accumulated on tank bottom is pumped to grit collecting tank.

Other information

Advanced treatment plant is constructed for reusing of treated wastewater. There is a complete process arrangement for treating in order to meet requirement for reuse. Wastewater treatment plant effluent is stored in a storage tank. Disinfection is done by injection of calcium hypochlorite 10% to storage tank.

Full technical specifications

Click here to download the PDF file.

Excellent Results

This project fully met our customer’s expectations.

Go to Top