Project Brief For this project, our company was responsible for purchase engineering services, procurement, Technical Inspection and good transportation of Cogenerators spare parts. Type of agreement for this project is EP. Product: Main Bearing MWM 12452207 Engine Type: MWM TCG 2020 Origin: Austria Quantity: 56 Unit Price: 138 € Product: Sealing Gland MWM 12307718 [...]

Physical / chemical water treatment plant
Eilya Golshan2025-04-24T11:05:46+00:00Project Brief The water treatment plant is designed according to the physical and chemical method. For this plant, two modules with an average flow rate of 108,000 m3 / d were considered. The contract type for this project is EPC. Made by Other project images [...]

Mechanical, Electrical, Control, and Instrument spare part supply -2
eetwater2025-04-24T11:06:21+00:00Project Brief For this project, our company was responsible for purchase engineering services, procurement, Technical Inspection and good transportation of mechanical, electrical, control, and instrument equipment of municipal wastewater treatment plant. Type of agreement for this project is EP. Made by Other project images [...]
Aeration System Supply
eetwater2025-04-24T11:06:56+00:00Project Brief For this project, our company was responsible for purchase engineering services, procurement, Technical Inspection and good transportation of Turbo Blowers with average flowrate 4600 m3/hr Type of agreement for this project is EP. Made by Other project images [...]

Mechanical, Electrical, Control, and Instrument spare part supply
eetwater2025-04-24T11:07:28+00:00Project Brief For this project, our company was responsible for purchase engineering services, procurement, Technical Inspection and good transportation of mechanical, electrical, control, and instrument equipment of municipal wastewater treatment plant. Average flowrate 600000 m3/d. Type of agreement for this project is EP. Made by Other [...]
Reuse of treated municipal wastewater
eetwater2025-04-24T11:08:06+00:00Project Brief Tertiary treatment is designed based on physical and chemical method, ultrafiltration and reverse osmosis system. Two modules are considered for this plant with average flowrate 10000 m3/d. Type of agreement for this project is EPC. Made by Other project images [...]
Complex Water Pump Station
eetwater2025-04-24T11:08:39+00:00Project Brief Water pump station is designed with average flowrate 13680 m3/d and 1300 meter head. Type of agreement for this project is EPC. Made by Other project images Skills Needed Environmental engineering, Chemical engineering, Mechanical [...]

Physical and Biological Moving Bed Biofilm Reactor (MBBR) wastewater treatment plant
eetwater2025-04-24T11:09:10+00:00Project Brief Wastewater treatment plant is designed based on anoxic and MBBR method with phosphorous, nitrogen and BOD removal. One module is considered for this plant with average flowrate 200 m3/d. Type of agreement for this project is EPC. Made by Other project images [...]
Reuse of treated industrial wastewater
eetwater2025-04-24T11:09:43+00:00Project Brief Tertiary treatment is designed based on physical and chemical method and also reverse osmosis system. Two modules are considered for this plant with average flowrate 18000 m3/d. Type of agreement for this project is EPC. Made by Other project images [...]
Reuse of treated municipal wastewater
eetwater2025-04-24T11:10:23+00:00Project Brief Tertiary treatment is designed based on physical and chemical method. Two modules are considered for this plant with average flowrate 6048 m3/d. Type of agreement for this project is EPC. Made by Other project images [...]